Company History

We sincerely thank everyone who visits the homepage of Steel Korea.

History

The path taken by Steel Korea Co., Ltd.

  • 2022. 03. Installation of 2 large CNC Turning Machines (Max size: 8,530*6000* h2000)
2021~
2011~2020.
  • 2020. 09. Received the Prime Minister’s commendation (for contribution to industrial development)
  • 2016. 12. Awarded for achieving $3 million in exports
  • 2016. 08. Installation of 1 large CNC Gantry Drill Machine (Max size: 10,000*10,000mm, Hole: Φ100)
  • 2016. 08. Completed and relocated Steel Korea Co., Ltd.’s new
  • 2012. 11. Received a commendation from the Minister of Knowledge Economy and achieved $1 million in exports
  • 2008. 10. Acquired ISO 9001:2008 certification
  • 2007. 12. Busan branch established (equipment introduction completed)
  • 2007. 10. Establishment of Steel Korea Co., Ltd.’s second factory (Noksan Factory)
  • 2006. 07. Steel Korea Co., Ltd. expanded business area (Steel Division, Forging Division, Machining Division)
  • 2005. 09. Establishment of Steel Korea Co., Ltd.
2005~2010.